Consolidated Linear Infrastructure Environmental Compliance Approvals
Share Consolidated Linear Infrastructure Environmental Compliance Approvals on FacebookShare Consolidated Linear Infrastructure Environmental Compliance Approvals on X (formerly Twitter)Share Consolidated Linear Infrastructure Environmental Compliance Approvals on LinkedinEmail Consolidated Linear Infrastructure Environmental Compliance Approvals link
The City of Belleville has been approved by the Ministry of the Environment Climate Change and Parks (MECP) to receive, approve and issue Environmental Compliance Approvals that are preauthorized by the MECP. These preauthorized works include most alterations to City’s municipal sewage collection system and stormwater management system.
Pre-authorization Criteria
The CLI-ECA approval means that developers and the City are no longer required to submit individual pipe-by-pipe ECA applications to the MECP provided the projects meet the following criteria.
The alterations follow the MECP’s design criteria.
The alteration meets the requirements of the City’s Sewage CLI-ECA (ECA Number 151-W601) which includes sanitary pipes and pumping stations.
The Alterations meets the requirements of the City’s Stormwater Management CLI-ECA (ECA Number 151-S701) which includes storm pipes, Stormwater Management Facilities including Ponds, Oil and Grit separators and Low Impact Development features.
The alteration satisfies all other provincial and municipal conditions and standards.
The alteration is proposed on land that is currently owned by or will be owned by the city after assumption.
Projects that do not meet these requirements for pre-authorization may still proceed but will require a direct submission to the MECP for review and approval as a Schedule C Amendment. These non-preauthorized projects will still follow the same application framework to ensure all other application requirements are met. Additionally, works that are being proposed on private property will also require a direct submission to the MECP.
Application Requirements
General Applicant information (legal name and address)
Agent or consultant information
Project information and description (project name, subdivision number, plan number, municipal address, facility ID number, etc.)
Completed application forms and any required attachments (drawings, reports etc.)
Completed Stormwater Management Facility Tables in "Word" format.
Completed application checklist
Development Submissions
Upon completion on the design of the proposed alteration to the Sewage collection System and Stormwater Management system applicants may submit their completed application package via Cityview.
The City will review the application for completion and provide the applicant with an approval letter and forms signed by the City as well as receipts for applications fees.
All reports and drawings must follow the MECP requirements for sewage and stormwater work as well as the City of Belleville's Development Manual.
The City of Belleville has been approved by the Ministry of the Environment Climate Change and Parks (MECP) to receive, approve and issue Environmental Compliance Approvals that are preauthorized by the MECP. These preauthorized works include most alterations to City’s municipal sewage collection system and stormwater management system.
Pre-authorization Criteria
The CLI-ECA approval means that developers and the City are no longer required to submit individual pipe-by-pipe ECA applications to the MECP provided the projects meet the following criteria.
The alterations follow the MECP’s design criteria.
The alteration meets the requirements of the City’s Sewage CLI-ECA (ECA Number 151-W601) which includes sanitary pipes and pumping stations.
The Alterations meets the requirements of the City’s Stormwater Management CLI-ECA (ECA Number 151-S701) which includes storm pipes, Stormwater Management Facilities including Ponds, Oil and Grit separators and Low Impact Development features.
The alteration satisfies all other provincial and municipal conditions and standards.
The alteration is proposed on land that is currently owned by or will be owned by the city after assumption.
Projects that do not meet these requirements for pre-authorization may still proceed but will require a direct submission to the MECP for review and approval as a Schedule C Amendment. These non-preauthorized projects will still follow the same application framework to ensure all other application requirements are met. Additionally, works that are being proposed on private property will also require a direct submission to the MECP.
Application Requirements
General Applicant information (legal name and address)
Agent or consultant information
Project information and description (project name, subdivision number, plan number, municipal address, facility ID number, etc.)
Completed application forms and any required attachments (drawings, reports etc.)
Completed Stormwater Management Facility Tables in "Word" format.
Completed application checklist
Development Submissions
Upon completion on the design of the proposed alteration to the Sewage collection System and Stormwater Management system applicants may submit their completed application package via Cityview.
The City will review the application for completion and provide the applicant with an approval letter and forms signed by the City as well as receipts for applications fees.
All reports and drawings must follow the MECP requirements for sewage and stormwater work as well as the City of Belleville's Development Manual.