Airport Parkway Culvert Replacement

Share Airport Parkway Culvert Replacement on Facebook Share Airport Parkway Culvert Replacement on X (formerly Twitter) Share Airport Parkway Culvert Replacement on Linkedin Email Airport Parkway Culvert Replacement link

The aging Airport Parkway culvert will be replaced due to the structural deficiencies identified in the 2021 inspection.

Replacement of the structure is necessary to maintain a safe and reliable road network.


Planned Improvements:

  • Identified for replacement in the 2021 Ontario Structure Inspection Manual inspections
  • Precast concrete box culvert
  • New paving and steel beam guide rail


These upgrades will develop a safe and efficient road and transportation system that addresses the needs of our residents and businesses.

The aging Airport Parkway culvert will be replaced due to the structural deficiencies identified in the 2021 inspection.

Replacement of the structure is necessary to maintain a safe and reliable road network.


Planned Improvements:

  • Identified for replacement in the 2021 Ontario Structure Inspection Manual inspections
  • Precast concrete box culvert
  • New paving and steel beam guide rail


These upgrades will develop a safe and efficient road and transportation system that addresses the needs of our residents and businesses.
  • Tender Closed

    Share Tender Closed on Facebook Share Tender Closed on X (formerly Twitter) Share Tender Closed on Linkedin Email Tender Closed link

    The Tender for the replacement of the Airport Parkway Culvert has now closed and bids are being evaluated

    The Tender for the replacement of the Airport Parkway Culvert has now closed and bids are being evaluated

  • Issued for Tender

    Share Issued for Tender on Facebook Share Issued for Tender on X (formerly Twitter) Share Issued for Tender on Linkedin Email Issued for Tender link

    The Airport Parkway Culvert Replacement project is currently out for tender with an anticipated start date of summer 2026 and completion by end of 2027.

    The Airport Parkway Culvert Replacement project is currently out for tender with an anticipated start date of summer 2026 and completion by end of 2027.

  • Expected Construction Start

    Share Expected Construction Start on Facebook Share Expected Construction Start on X (formerly Twitter) Share Expected Construction Start on Linkedin Email Expected Construction Start link

    Construction anticipated to begin in summer of 2026; completion in Fall 2026

    Construction anticipated to begin in summer of 2026; completion in Fall 2026