The City of Belleville is seeking proposals from qualified Engineering Consulting Firms to complete detailed investigations, design, permitting, cost estimating, and preparation of a tender-ready construction package for the replacement or rehabilitation of the twin Structural Plate Corrugated Steel Pipe (SPCSP) culverts located on Blessington Road. The Consultant will determine the optimal long-term solution considering structural, hydraulic, environmental, and geotechnical conditions at the site.

2. Background & Existing Conditions

Based on the September 2025 OSIMS Report (revised January 30, 2026), the following conditions were identified at the site:

  • Twin SPCSP culverts are in fair to poor condition.
  • Medium to severe corrosion and perforation present along the bottom of both barrels.
  • North gabion baskets show significant leaning, light to medium bulging, and minor loss of material.
  • Replacement of the structure is recommended within 1–5 years.
  • Guiderails exhibit deficiencies including broken and leaning posts, checking/splitting of timber, rot at tops, and severe collision damage on the north side.
  • Current replacement value is based on in-kind replacement only and does not account for potential geometric changes (widening/lengthening). The Consultant shall verify all conditions and evaluate site-specific requirements.

The City of Belleville is seeking proposals from qualified Engineering Consulting Firms to complete detailed investigations, design, permitting, cost estimating, and preparation of a tender-ready construction package for the replacement or rehabilitation of the twin Structural Plate Corrugated Steel Pipe (SPCSP) culverts located on Blessington Road. The Consultant will determine the optimal long-term solution considering structural, hydraulic, environmental, and geotechnical conditions at the site.

2. Background & Existing Conditions

Based on the September 2025 OSIMS Report (revised January 30, 2026), the following conditions were identified at the site:

  • Twin SPCSP culverts are in fair to poor condition.
  • Medium to severe corrosion and perforation present along the bottom of both barrels.
  • North gabion baskets show significant leaning, light to medium bulging, and minor loss of material.
  • Replacement of the structure is recommended within 1–5 years.
  • Guiderails exhibit deficiencies including broken and leaning posts, checking/splitting of timber, rot at tops, and severe collision damage on the north side.
  • Current replacement value is based on in-kind replacement only and does not account for potential geometric changes (widening/lengthening). The Consultant shall verify all conditions and evaluate site-specific requirements.
  • Project Commencement

    Share Project Commencement on Facebook Share Project Commencement on X (formerly Twitter) Share Project Commencement on Linkedin Email Project Commencement link

    Stay tuned to our news feed for ongoing project updates.

    Stay tuned to our news feed for ongoing project updates.